After a review of a historic well data, a major UKCS Operator identified the requirement for remedial barrier placement on several of the platform wells to be permanently abandoned.
Due to the small platform footprint and available deck space, a P&A specific Hydraulic Workover Unit (HWO) was chosen by the client as the optimal solution for performing the downhole operations.
Check our out latest case study, linked below, which outlines, in detail how HydraWell flawlessly executed PWC operations from HWO® unit for the client.