We are delighted to announce we have landed one of our biggest contract wins in the North Sea to date.
We will be undertaking a major decommissioning project to support the permanent abandonment of 9 wells with our revolutionary Perforate, Wash & Cement (PWC®) system, designed for specialist wellbore applications.
The PWC® system provides a ground-breaking solution, replacing traditional Plug & Abandonment (P&A) and downhole tooling techniques.
We will also deliver TCP perforating services, sub-contracted from Halliburton, as well as AIT services, in the 12-month contract.
Tom Leeson, HydraWell Chief Commercial Officer, said: “This latest round of work aims to reduce costs through innovative engineering and optimisation of operational procedures."
"We are delighted that HydraWell has been selected for this project that will allow us to build on our growing library of computational fluid dynamic modelling results."
“This will help us eliminate unnecessarily conservative operations and therefore reduce overall time spent on the campaign.”
Recent Posts
- Case Study: HydraCT™ Delivers Breakthrough Well Abandonment Solution in Australia
- Case Study: Revolutionising Onshore Well Abandonment with PWC® Technology
- Case Study: Forecasting with Confidence: PWC
- HydraWell pushing boundaries as a pioneering innovator
- Case Study: Flawlessly executing PWC® operations
- Key COO Appointment
- Leading light in well integrity will maximise strength through synergy
- Introducing HydraCT!
- Case Study: Carbon Capture and Storage (CCS) Campaign
- New combined management team set to maximise growth from synergy